News
Contact Us
Room 602, 6 / F, North Of Tao Ni Le Building, 62 Changdi Road, Baisha SanVillage, Humen Town, Dongguan ,GuangDong,China
Call Us:
+86-769-85386119
Home > Acrylic led chiller


20150708  received customer’s  inquiry and original drawings
20150711  customer visited factory and  talked about details  and exchanged of views on the mold and design directly with our engineer. 
20150717 Customer confirmed (1> Mould cost  2>Unit price 3>Delivery time  4>3D modification csot )
20150723 Signed the contract and offered “Supplier PreQualifying Assessment & Verification” , mold production started 
20150729 Customer made modification suggest  on the product design  and change 24pcs LED lights to 50pcs  (to make it much more attractive ) 
20150731 confirmed the color 
20150808 Confirmed all mold modification and extra cost . 
20150818 Confirmed lithium-ion rechargeable batteries and charger adapter 
20150821 Offered printing file /logo file 
20150827 first tryout on mold for size ,structure ,assembling checking 
20150901 first tryout for mold injection, laser logo,chrome logo and colored 
20150910 pre-production sample finished 
20150912 Customer visited factory again and checked the sample , several points needs to be improved 
20150922 confirmed the mold and pre-production sample started the bulk production 
20151024 first lot had been shipped out 
20151029 second lot shipped out 
20151030 third lot shipped out